Cement Calculations (Casing)

Well Data:

Size (in)

I.D. (in)

Depth (ft)

Last Casing

Hole Size

Casing Data:

Size (in)

I.D. (in)

Depth (ft)

Casing:

Float Track Length

Rat hole (ft)

Capacity Factor

Float Collar Top

Cement Data:

From (ft)

To (ft)

Length (ft)

Open Hole (ft)

Lap (ft)

Lead –

Tail –

Yield (ft3/sk)

Water (gps)

Lead –

Tail –

Volumes:

X

=

Bbls/Ft

X

=

Bbls/Ft

Lead:

Length

bbl

Excess (%)

Cubic Feet

Yield

Sacks

Lap

Open Hole

Total Lead =

Sacks/Bbls=

Mix Water=

Bbls.

Tail:

Length

bbl

Excess (%)

Cubic Feet

Yield

Sacks

Open Hole

Shoe

Total Tail =

Sacks/Bbls=

Mix Water=

Bbls.

Total Pipe Run =

Feet

Displacement =

bbl

Displaced by Cement Unit =

bbl

Displaced by rig pump =

bbl

bbls/stroke =

strokes

Final disp. W/ Cement Unit =

bbl