Using LCM through float equipment before cementing In some cases, we can see losses while running the casing or circulating before cementing. These losses open up the alternative to pump a Loss Circulation Material (LCM) pill as a possible mitigation to lower the losses ahead of the cement job. However, based on experience with float LCM equipment, the […]
Recent Comments